Factory for Lease in Ha Nam province

Châu Sơn, Tp. Phủ Lý, Hà Nam, Việt Nam
Triangle 1 Created with Sketch. For Rent Triangle 1 Created with Sketch. $2.5 /Sq. M/Month - Warehouse & Factory
2000 Sqm to 9000Sqm

Factory for Lease /Rent in Ha Nam province

  • Workshop for rent in Ha Nam
  • Total factory area: 9.996,8 sqm (03 factories)
  • Total land area:  15,269 sqm, using until 2056
  • The rent: 2.5$/sqm/month (factory) và 1.5$/sqm/month for parking.
II – LOCATION AND REGIONAL RELATION
Hanoi CenterIt is 58 km from Hanoi Center
AirportIt is 80 km from Noi Bai International Airport
RoadIt is 1 km from Highway 1A, It is bounded by  Highway 1A bypass
WaterwayIt is 500m form Thinh Chau Port on Day river
Sea PortIt is 100 km from Hai Phong PortIt is 150 km from Cai Lan Port- Quang Ninh
RailwayIt is 3 Km from Phu Ly Station (On North South Railway)
III – INFRASTRUCTURE
PremisesTotal area: 9,996.8 m2 (03 workshops)
Power SupplyPower supply is provided continuously and stably from 110/35 KV substation.
Water SupplyThe capacity of 31,000 m3/day-night will sufficiently meet the Employer’s demand for clean water

The water supply system is led to the workshop.

DrainageRainwater and sewage drainage system (industrial and domestic wastewater) are built separately. Rainwater is collected through sewers and drained into rivers in the region. Wastewater is collected in the wastewater treatment plant of Chau Son Industrial Park.
Wastewater and waste treatmentIndustrial wastewater and domestic wastewater is fully treated through the septic tank system before being discharged into the common wastewater drainage system of the industrial park.The wastewater treatment plant will be built with the capacity of 2,900m3/day-night and will increase capacity when necessary.
Solid waste from factories in Industrial Parks will be collected, classified and transported by the fully functional units for treatment.
Telecommunications and InternetReady to meet 9-10 lines/ha and meet the demand for domestic and international postal services.The underground cable system is connected directly to the fence of enterprises.
Internal Traffic and lightingThe internal road system is designed reasonably so that vehicles may reach each factory easily and conveniently.Lighting system is installed along the roads and internal roads.
Fire prevention and extinguishmentWater supply systems and fire hydrants are located along the internal roads.
Environment and GreeneryThe greenery system accounts for 10% of the total area of the workshop project, combining centralized green trees and green trees along the roads to create a common landscape for the industrial park.
IV –  RENT AND  FEE OF UTILITIES
WorkshopUnit price of workshop: 2.5 USD/m2/month; Garage: 1.5 USD/ m2/ month
Minimum rent: 03 years
Leased area: 308 m2 – 3.300 m2
Deposit: 06 month’s rent at minimum
Payment method: Every year
Maintenance fee2,275/m2/month (Equivalent to US$ 0.1/m2/month)
Electricity price – Voltage < 6KVAccording to the Electricity Price prescribed by EVN
Water priceVND 12,500/m3 equivalent to US$ 0.549/ m3 (Exclusive of 5% of VAT)
Wastewater treatment priceVND 9,600/m3 (equivalent to US$ 0.42/m3) – monthly payment. The volume is determined by 80% of clean water used.
Internet, other services priceTheo quy định của các đơn vị cung cấp tại thời điểm sử dụngUnder the regulations of the Supplier at the usage time
Reference salaryMinimum regional wage: VND 3,090,000/month (equivalent to US$135.8/month)

(Applied from 01/01/2018 under Decree No. 141/2017/ND-CP dated 07/12/2017)

Current Salary:

1. Workers: VND 3,500,000 – 4,000,000/ month

(Equivalent to: US$ 155.35 – US$ 177.54/month)

2. Office staff/ technician/ engineer: VND 4,000,000 – 6,000,000/month

(Equivalent to: US$ 179.13 – 268.7/month)

3. Manager/ Accountant/ Manager: VND 7,000,000 – 10,000,000/month

(Equivalent to: US$ 313.48 – 447.83/month)

(Google Map)